RELAY COORDINATION PART -III

Dead End Equipment (Motor Protection)

Motor Contactor Rating

Contactor cannot break fault kA, but it can break kA of 8-10 times its rating.

Earth fault (E/F) relay operates to open the contactor at kA greater than the contactor interrupting capability.

Incorrect Selection

E/F relay is slower and the fuse takes over to open & not contactor at kA greater than contactor interrupting capability.

Dead End Equipment (Motor Protection)- Motor Negative Phase Sequence Settings

These settings are based on following Negative Phase Sequence (NPS) withstand values

  • Continuous NPS rating I2 p.u.
  • Short time NPS I2
  • I2 2 t rating (K).

Motor continuous I2 withstand pick up should be set based on maximum unbalance voltage that the motor can withstand as this determines the continuous I2  flow in the motor.

For motors above 2500 kW the NPS thermal damage limit as I2 2 t constant K is taken as 15 sec when data has to be assumed.

For motors below 2500 kW it is 10 sec when data has to be assumed.

Actual I2 2 t constant K value should be obtained from vendor.

Assuming 2% unbalance in the supply voltage and LRC to be 6 times of FLC, the continuous withstand negative sequence of the motor, I2 would be 6ร—2=12%.

  • Typical negative sequence relay setting shall be
  • The I2 current pick up of 15%, with I2 2 t curve set below

                I2 2 t  = K (Typically K = 15) withstand curve of motor.

  • For faster definite time trip, the current pick up of 57% of full load current with time delay of 1 sec, this delay time is required for the coordination with downstream relay.

 

Dead End Equipment (Motor Protection)- Motor Negative Phase Sequence Settings

Overcurrent Protection โ€“ Coordination โ€“ Manual Calculation

Overcurrent Protection โ€“ Coordination โ€“ Manual Calculation-Fault

Overcurrent Protection โ€“ Coordination โ€“ Manual Calculation Relay Setting-Excel

System SLD & Relay Coordination Example Using Software ETAP

System SLD & LV CB Release Coordination Example Using Software ETAP

 

Overcurrent Protection โ€“ Coordination-Thermo magnetic Release Curve OF LVCB

Relay Coordination-Overcurrent & LV Release Coordination

SEN EDS offers Engineering Consultancy, Detailed Engineering Services and Power System Engineering Services (ETAP & DIgSILENT & PSCAD) for Switchyard up to 400kV Substation, Port, Industrial Project (Oil and Gas Plant, Steel Plant, Thermal Power Plant, Cement Plant, Water Treatment Plant), Grid Impact Study and Grid Code Compliance (UK, Oman, KSA, UAE, etc.), Airport Project, Specializing in Renewable Energy (Solar and Wind with BESS Plant)